This project involved the replastering of two external and two internal walls in a lime render. It also involved the removal of the existing pews and their re-modelling and refurbishment to their original condition, and the introduction of underfloor heating which required the removal and reinstatement of existing timber and stone floors.
The choir stands by the main altar were remodelled to reflect the original interior, by the Tom O’Brien Construction craftsmen.
Location Cathedral Square, Waterford
Architect Mr. Ken Wigham
Client Christchurch Cathedral Waterford Foundation